What some people are saying about the Build Time Estimator


Dear Joel,

This is really fine !
I am very much interested in your work, as we already implemented a
simple build time estimator within our RP System Selector.
(See http://www.biba.uni-bremen.de/groups/rp/rp_selec.html).

Naturally, we are interested in enhancing our system (and I am interested
in using RP system selection as >my horse

Joel,
I down loaded your estimator this morning (SGI Indy)and tried it on 2
recent builds. The first one was off by about 9% (13hr build) while the
second was only off by 2.4% (33hr build) Do you find shorter build to
less accurate?  Good work!
--

Regards,

Joe DeGuglielmo
Eastman Kodak Company
Rapid Prototyping Center
901 Elmgrove Rd.
Rochester, NY 14653-5315
(716)-726-7046
jfdegug@kodak.com


Joel:

I "fooled" the 3D Systems' workstation into creating an SLA-250 build 
file (your estimator's standard input) for my SLA-500 builds.  I forgot 
how HUGE the SLA-250's .v file is versus the .bff file for the SLA-500.
I plugged the data into your build estimator and was within 1 hour of 
actual for a 20 hour build w/6 individual pieces, and a 24 hour build of 
2 individual pieces.  The former estimated 1 hour high while the latter 
estimated 1 hour low.  Each build had several recoater ranges with single 
and multiple sweeps for trapped volumes.  I'm certain some error in my 
results occur while converting recoating time (sweep speed, Z-Stage 
speed) from SLA500 units to SLA250 equivalents.  If I have time, I'll 
slice a highchair seat to get a read on the results of an 1
8" tall build!

GREAT JOB.  I'M IMPRESSED!!

--
Steve Deak                      E-mail: ht-grp@cinti.net
Manager-RP Services             Voice:  (513) 579-3270
Hasbro Toy Group                Fax:    (513) 579-3250
615 Elsinore Place
Cincinnati, OH  45202           "Our Business is Fun!"
USA


G'day Joel,
I would like to congratulate you on a fine effort in respect to you
build time estimator. I have tested it over the internet on a small
job I ran today.
Your estimated time for the run was 5:36
Actual run time was 5:34
Error less than one percent.

Just give you a little background on us, I run the SLA Lab here at
the Royal Melbourne Institute of Technology (RMIT). Were we have
installed a SLA 250/40 running a 40Mw laser.

Best regards
Robert Gologranc

Robert Gologranc           	|    Tel: 61 3 9660 4485
Technical Manager          	|    Fax: 61 3 9660 4831
RMIT - Product Express   	|    E-Mail: pexpress@rmit.edu.au
115 Queensberry Street   	|
Carlton VIC 3053              	|
Australia                    	|


Down loaded your estimator. Tried it on a 49 hour build on an SLA-250
and found it to be 1 hour high. Looks good, this will save a lot of
guessing!

Drew Brown
Conceptual Reality L.L.C.
Phone:(810)926-8820
Fax:(810)926-8830
E-mail: ConReality@greatid.com


Build time 9 hr 47 min, estimator 9 hr 53 min.

Do you have an estimator for the SL5170 weave build style?

FYI

Drew Brown
Conceptual Reality


Joel,
     
     My name is Dave Young.  I work for Lever Brothers Ltd in Port Sunlight 
     England.  (Detergent manufacturers and part of the Unilever world 
     empire.)  I've been evaluating your build time estimator program and 
     like it very much.  It's accurate and easy to use.  The ability to 
     'estimate' build times has allowed us to plan our use of our SLA-250 
     more effectively, and for that I thank you.  By the way.  You 
     mentioned in your read me text file that a PC version of the program 
     may be developed.  If this is so, how can I obtain a copy?
     
     Cheers,

     Dave
     

Hello Joel,

I have them sliced allready and the parts are build too. The building was 
interrupted by a failure of the cooling system. I need to know the 
correct build time of these three parts for my dissertation and there are no 
funds for repeating the whole thing. I thought your build time estimator 
could be of help for me.

Volker


 